Home / MarketersMEDIA

Sumitomo Metal Mining Advances Kalgoorlie Nickel Project - Goongarrie Hub: Agreement Reached to Commence Pre-FEED in Preparation for FEED

Sumitomo Metal Mining Advances Kalgoorlie Nickel Project - Goongarrie Hub: Agreement Reached to Commence Pre-FEED in Preparation for FEED

Sumitomo Metal Mining has reached an agreement to commence the Pre-FEED study for the Kalgoorlie Nickel Project - Goongarrie Hub in Western Australia, advanced jointly with Ardea Resources and Mitsubishi Corporation.

Tokyo, Japan, November 24, 2026 -- Sumitomo Metal Mining Co., Ltd. (TSE: 5713) has reached an agreement with the relevant parties to commence the next phase of study (the Pre-FEED) for the Kalgoorlie Nickel Project - Goongarrie Hub (the Project). The Project is being advanced jointly with Ardea Resources Limited of Australia and Mitsubishi Corporation. Pre-FEED will be conducted before the Project proceeds to front-end engineering and design (FEED), the basic engineering phase that focuses on technical requirements, high-level cost estimates and other relevant factors.

Located in Western Australia, the Project is expected to produce an intermediate product known as mixed nickel-cobalt sulfide, containing approximately 30,000 tonnes of nickel and 2,000 tonnes of cobalt per year for more than 40 years(*1).


Pre-FEED will be conducted by Kalgoorlie Nickel Pty Ltd (KNPL), the Project's operating company, with completion targeted for 2027. The cost of Pre-FEED, amounting to AUD 58.8 million (approximately JPY 6.5 billion*2), will be funded by the joint venture between Sumitomo Metal Mining and Mitsubishi Corporation. As a result, the joint venture's interest in KNPL will increase from 35% to 45%, while its offtake rights to the Project's production will increase from 75% to 80%.


Sumitomo Metal Mining will contribute to the sustainable growth of the global economy and the transition to a low-carbon society through the stable supply of nickel and cobalt, which are critical minerals that support a wide range of industries.


(*1) Calculated based on the results of the pre-feasibility study announced by Ardea Resources in July 2023. https://ardearesources.com.au/downloads/announcements/arl_2023070501.pdf


(*2) Converted at a rate of AUD 1 = JPY 110.34 (the average TTM rate for October 2026)

Release ID: 89210729

If you detect any issues, problems, or errors in this press release content, kindly contact error@releasecontact.com to notify us (it is important to note that this email is the authorized channel for such matters, sending multiple emails to multiple addresses does not necessarily help expedite your request). We will respond and rectify the situation in the next 8 hours.

Source: MarketersMedia

Leave a comment

Comments are closed on this post.

Related